Job Overview
Power Grid Corporation of India Limited (POWERGRID), a Maharatna PSU under the Ministry of Power, invites applications for 1543 contractual vacancies for the posts of Field Engineer and Field Supervisor in Electrical, Civil, and Electronics & Communication disciplines. The recruitment will be conducted via POWERGRID Common FTE Written Test-2025.
The posts are offered on a fixed-term engagement basis, initially for 24 months and extendable up to 5 years, based on project needs and individual performance. Selected candidates will be deployed across various regional and subsidiary offices of POWERGRID.
Job Summary
Field | Details |
---|---|
Job Title: | Field Engineer / Field Supervisor |
Organization: | Power Grid Corporation of India Limited (POWERGRID) |
Location: | All India (Region-specific) |
Qualification: | B.E/B.Tech/B.Sc Engg or Diploma (Discipline-wise) |
Salary: | ₹23,000 – ₹1,20,000 per month |
Apply By: | 17 September 2025 |
About the Organization
Powergrid corporation is a central PSU under the Government of India, engaged in bulk inter-state power transmission. With a network of over 1,80,000 circuit kilometers of transmission lines and 286 substations, POWERGRID transmits about 50% of India’s total generated electricity. The organization also manages a vast telecom network and offers consultancy services globally. It reported a turnover of ₹47,459 crore and a PAT of ₹15,521 crore for FY 2024-25, reflecting its strong and stable financial foundation.
Power Grid Salary
- Field Engineer: ₹30,000 – ₹1,20,000/month + DA + HRA + Perks (CTC ~₹8.9 LPA)
- Field Supervisor: ₹23,000 – ₹1,05,000/month + DA + HRA + Perks (CTC ~₹6.8 LPA)
- Annual Increment: 3%
- RDSS Project Employees: Perks are performance-linked (max 35% of basic)
Eligibility Criteria
Qualification
- Field Engineer (Electrical): B.E/B.Tech/B.Sc (Engg.) in Electrical or equivalent
- Field Engineer (Civil): B.E/B.Tech/B.Sc (Engg.) in Civil
- Field Supervisor (Electrical): Full-time Diploma in Electrical or equivalent
- Field Supervisor (Civil): Full-time Diploma in Civil
- Field Supervisor (E&C): Full-time Diploma in Electronics/IT/Communication or equivalent
Note: Higher technical qualifications (e.g., B.Tech/BE/ME/M.Tech) are not allowed for Supervisor posts.
Age Limit
- Maximum: 29 years as on 17.09.2025
- Relaxations:
- SC/ST: 5 years
- OBC (NCL): 3 years
- PwBD: 10 to 15 years (as per category)
- Ex-servicemen: As per Govt. norms
Experience
- Minimum 1-year post-qualification experience in areas like:
- Transmission lines, rural electrification (RE), substations (S/S), Telecom Systems, DMS, etc.
- Preference: PSU/Listed power sector companies
Other Requirements
- Medical fitness per POWERGRID standards
- NSR (National Skills Registry) registration
- Police verification from permanent address
Selection Process
Common FTE Written Test (All Posts)
- Duration: 1 hour
- Sections:
- Technical Knowledge (50 questions)
- Aptitude Test (25 questions)
- No negative marking
- Language: English or Hindi
- Qualifying Marks: 40% (UR/EWS), 30% (SC/ST/OBC)
For Field Engineer
- Shortlisted from written test scores
- Interview conducted by respective regions
- Final merit list based on interview performance
For Field Supervisor
- Final selection based on written test marks only
- No interview
Application Process / How to Apply
- Visit: https://www.powergrid.in / Apply Now
- Go to Careers → Job Opportunities → Executive Positions on All India Basis
- Click on “Engagement of experienced personnel on Contract Basis”
- Register with valid email and mobile number
- Fill the application and upload necessary documents
- Pay the fee online (if applicable)
- Submit before 17 September 2025 (11:59 PM)
Application Fee
- Field Engineer: ₹400
- Field Supervisor: ₹300
- SC/ST/PwBD/ExSM: Exempted
Important Dates
Event | Date |
---|---|
Online Application Start Date | 27 August 2025 |
Last Date to Apply | 17 September 2025 |
Cutoff for Age & Experience | 17 September 2025 |
Written Test | To be announced |
Frequently Asked Questions (FAQs)
1. Is POWERGRID a Government company?
Yes. POWERGRID is a Maharatna PSU under the Ministry of Power, Govt. of India, involved in national electricity transmission.
2. How many power grids are there in India?
There is one national power grid in India, segmented into five regional grids, all managed by POWERGRID.
3. Is POWERGRID share overvalued or undervalued?
Market experts see POWERGRID shares as stable due to its consistent dividends and strong infrastructure base. Tracking the PowerGrid InVIT IPO GMP and historical dividend trends like PowerGrid dividend 2021 helps assess valuation.
4. How to join Power Grid Corporation of India?
Apply via powergrid.in. Look for official recruitment in newspapers, employment news, and online. Positions range from engineers, supervisors, to apprenticeships.
5. What is PowerGrid InVIT IPO?
The PowerGrid Infrastructure Investment Trust (InVIT) IPO allowed investors to buy into POWERGRID’s income-generating assets. Key phrases:
- PowerGrid InVIT IPO listing date
- PowerGrid InVIT IPO allotment status
- PowerGrid InVIT IPO price
- PowerGrid InVIT IPO subscription status
6. What training is provided to new POWERGRID employees?
New joiners receive 1-year training, including classroom, field training, soft skills, and wellness activities like yoga, industrial visits, and mentoring.
7. How to get RTI information from POWERGRID?
Send your RTI application to Public Information Officers listed on the POWERGRID site. Fee and written request are required.
8. Where to find POWERGRID regional office contacts?
Visit the “Contact Us” section on powergrid.in for locations like NR-I (Faridabad), WR-I, WR-II, SR-I, SR-II, etc.
9. Is PowerGrid Switchgears Pvt. Ltd. part of POWERGRID?
No. PowerGrid Switchgears Pvt. Ltd. is a private entity and is not affiliated with Power Grid Corporation of India Limited.
10. What is the PowerGrid Apprenticeship Program?
It provides hands-on technical training to ITI/diploma/degree holders with stipends and exposure to large-scale power infrastructure.
11. How can I become a registered POWERGRID vendor?
Vendor registration is available online via the POWERGRID vendor portal. Applicants must meet compliance and technical standards.
External Links
- Official Website: Check the official link/apply link from given sources
- Employment News: https://employment-news.gov.in
- Ministry of Power: https://powermin.gov.in